ہوم › نوکریاں › Foreman Mechanical

← واپس جائیں نوکریاں
💼 نوکریاں

Foreman Mechanical

قابل مذاکرہ
دمام · پوسٹ کیا گیا 3h ago · 1 مناظر
اشتہار دینے والے سے رابطہ کریں
نامAnonymous
ابھی کال کریں 0543545994 WhatsApp bilal@gmozon.com بائع کو پیغام بھیجیں

عوامی مقامات پر ملیں اور چیز دیکھنے سے پہلے کبھی ادائیگی نہ کریں۔ Expatriates KSA ادائیگیوں کو ہینڈل نہیں کرتا۔

Report this ad

Help us keep Expatriates KSA safe. What's wrong with this ad?

Description

1. Daily Site Leadership & Safety

• Pre-Task Briefings: Lead Daily Toolbox Talks (TBT) and review Job Safety Analyses (JSA) with crew members to highlight hazards like high-pressure hydraulics and pinch points.
• Permit Management: Obtain and close out daily Permits to Work (PTW) and isolation certificates before any mechanical work begins.
• Crew Supervision: , bolt torquing technicians on daily basis

2. Flange Management & Technical Execution

• Joint Integrity Quality Control: Inspect flange faces for defects, alignment, and gaps before assembly. Ensure the correct gasket type and material are being deployed.
• Torque & Tension Sequencing: Enforce strict adherence to approved tightening sequences (e.g., star patterns or legacy cross-bolting methods) using proper lubricants to reduce friction variance.
• Equipment Oversight: Supervise the correct setup and handling of heavy manual torque wrenches, hydraulic torque equipment, and multi-stud bolt tensioning systems.

3. QA/QC & Engineering Compliance

• Data Verification: Extract specified torque values from engineering tables and isometric drawings, verifying calculations match the ASME PCC-1 guidelines.
• Equipment Calibration Checks: Verify that all hydraulic power packs and pressure gauges carry valid, up-to-date calibration certificates before field use.
• Final Sign-Off: Complete and sign Flange Inspection Reports and Final Torque Reports (FTR), creating a traceable paper trail for every critical joint.

4. Progress Reporting & Client Liaison

• Daily Progress Tracking: Maintain shift logs documenting completed joints, outstanding work, and any mechanical issues encountered.
• Client Interface: Coordinate directly with the main contractor or client QA/QC inspectors for final joint walk-downs and approval before hydrotesting phases begin.
send resume on bilal@gmozon.com
cc : mansour@gmozon.com
✓ Link copied to clipboard